New roofs

Do I need Building Regulations approval for a new roof?

In-depth guide · 6 minute read · Updated 5 September 2026

Short answer: Often yes, particularly where more than a defined proportion is renovated or thermal elements are changed. The route should be confirmed for the specific project.

Key takeawayMajor roof renovation often engages Building Regulations, particularly when a thermal element is renovated. Confirm the compliance route before work begins.

Why it matters

Roof renewal can affect structure, fire performance, insulation, ventilation and energy efficiency. The required route depends on the property and scope, so it should be established before materials are ordered.

What the contractor should clarify

  • Whether the work is notifiable
  • Who submits or self-certifies the work
  • Target thermal performance and complete insulation build-up
  • How ventilation and condensation risk are addressed
  • What happens where full upgrading is technically or economically constrained
  • Which certificate the homeowner receives at completion

Documents to retain

  • Accepted quotation and specification
  • Building Control or competent-person certificate
  • Product information
  • Photographs of concealed insulation and ventilation details
  • Guarantees and final paid invoice

What your quotation should confirm

  • Exact roof covering, underlay, battens and fixing specification
  • Scaffolding, waste removal and protection of the property
  • Leadwork, ventilation, insulation and Building Regulations route
  • How hidden timber defects and other variations will be evidenced and priced
  • Workmanship guarantee, product cover, payment terms and completion documents

Useful primary sources

These links provide regulatory, trade-body or manufacturer information. Product guidance does not replace a property-specific specification.

What to check next

  • Agree who notifies Building Control
  • Confirm insulation and ventilation compliance
  • Keep the completion documentation

When should you ask a roofer to inspect it?

Ask for a full roof survey when defects are widespread, repairs keep moving from one area to another, the underlay is failing or the cost of repeated access is becoming uneconomic. The roofer should show why replacement is justified and separate confirmed work from hidden-work allowances.

Safety first: do not climb onto a roof without suitable access, training and protection. Keep clear of loose coverings, unstable ceilings and water near electrical fittings.

About this guidancePublished by J & L Welch Roofing & Paving Services Ltd. General information, not an assessment of your roof.Content updated 5 September 2026 · How our answers are produced

Would you like a property-specific answer?

Request an inspection and written quotation from J&L Welch.

No deposit is required. Payment is due on completion within seven days, with the agreed scope and price confirmed in writing.

Request a quotation